Spec Home Construction Loans: How Private Construction Financing Works

How spec home construction loans are sized by your building experience, how draws pay your subs, and an example of one spec home financed for three builders.

A spec home construction loan pays for the lot and the build of a house you plan to sell or rent once it is finished, before you have a buyer. Banks often will not lend on spec homes, or they want a presale, personal income documents and weeks of review. A private construction lender sizes the loan on the project: your lot, your budget, the completed value and your building track record.

Requity Group is a direct private lender based in Tampa. We make ground-up construction loans to builders and investors, and we build and own real estate ourselves, so we read a construction budget the way you do. This guide covers how spec construction loans work, how private lenders size them by experience, how draws work, and what to send for a quote.

What is a spec home construction loan?

“Spec” is short for speculative: you build without a contract from a buyer, on the expectation that the finished home will sell or rent at a price that covers the cost and a profit. A spec construction loan is short-term financing, usually 12 to 24 months, that covers:

  • The lot. Part of the purchase price, paid at closing.
  • The build. The construction budget, held back and released in draws as each phase is completed and inspected.
  • Interest only on what is drawn. You do not pay interest on construction money until it is released.

When the house is done, you pay off the loan from the sale, or refinance into a long-term DSCR rental loan if you decide to keep it.

Private construction loans vs bank construction loans

You will see private construction loans called “hard money construction loans”. It is the same kind of loan: short-term, secured by the property and sized on the project. Hard money is the older term, from individual lenders who looked only at the land. Requity is a private lender with written guidelines, a draw system and terms you see up front. Our guide to private money lenders covers the difference in more detail.

Bank construction loan Private construction loan
Spec homes Often limited, or a presale required Built for spec homes
Decides on Your income, debts, tax returns and other banking The lot, budget, completed value and your build history
Time to close Weeks to months As few as 10 business days with plans and budget ready
Borrower You, often with a personal guarantee and deposits Your LLC or corporation, with a guarantee
Cost Lower rate, slower process Higher rate, priced for speed and flexibility

How private lenders size a spec construction loan

Three limits set the loan, and the lowest one wins:

  1. Loan-to-cost. A percent of your total project cost: lot plus construction budget.
  2. Loan-to-completed value. A percent of what the home is worth when finished, from the appraisal.
  3. The lot advance. A percent of the lot’s purchase price or value at closing.

Your building experience moves all three. With Requity, you need at least one ground-up project completed in the last three years, sold or refinanced. Fix and flips and rentals do not count toward it. More completed builds unlock more leverage:

Completed ground-up projects (last 3 years) Of total cost Of lot value at closing Of completed value
4 or more Up to 90% Up to 75% Up to 70%
2 to 3 Up to 85% Up to 70% Up to 70%
1 (700 credit score) Up to 80% Up to 65% Up to 65%

Loans run from $150,000 to $2,500,000 on single-family homes, townhomes, duplexes to fourplexes and ADUs. The construction budget is funded at 100% through draws, so the limits above are met by adjusting what the loan pays toward the lot at closing.

Example: one spec home, three builders

Here is how the same spec home is sized for builders with different track records. These are round numbers for illustration, not a quote, and they show the loan only, before points and closing costs.

The project Amount
Lot purchase price $100,000
Construction budget $400,000
Total project cost $500,000
Completed value (if the appraisal supports it) $750,000
4 or more builds 2 to 3 builds 1 build
Cost limit $450,000 $425,000 $400,000
Completed value limit $525,000 $525,000 $487,500
Lot advance plus full budget $475,000 $470,000 $465,000
Loan amount (lowest) $450,000 $425,000 $400,000
Held for construction draws $400,000 $400,000 $400,000
Loan toward the lot at closing $50,000 $25,000 $0
Your cash toward the lot $50,000 $75,000 $100,000

Things to notice:

  • The whole build is funded. In every column the loan holds the full $400,000 budget for draws, so you are not paying your framer or roofer out of pocket while you wait.
  • Your cash goes in once, at closing. It goes toward the lot. After that, the project runs on draws.
  • Your track record is worth real money. Moving from one completed build to four lowers the cash you need on this project by $50,000.
  • Cost is the tighter limit here. With a lower completed value, the value limit would set the loan instead, which is why a realistic appraisal matters before you buy the lot.

How construction draws work

The draw process matters as much as the rate on a spec build, because it decides how fast your subs get paid. A typical schedule follows the build:

Phase What is inspected
Site work and foundation Clearing, utilities, footers, slab or stem wall
Framing and dry-in Walls, trusses, sheathing, roof, windows and doors
Mechanicals Rough electrical, plumbing and HVAC
Interior Insulation, drywall, cabinets, flooring
Completion Fixtures, final inspections, certificate of occupancy

With Requity you request a draw in the online portal when a phase is done, a third-party inspector confirms the work, and funds are released within 2 to 3 business days of a passed inspection. You pay interest only on the money drawn so far, so your carrying cost is lowest when the project is just getting started.

What to check before you buy the lot

1. The completed value

Pull sales of new or recently built homes nearby with similar size, finishes and lot. The completed value limit is set by the appraisal, not by your hopes for the market, so build your numbers on comps you could defend.

2. A budget a lender can read

A line-item budget by phase, with a contingency, closes faster than a single number. It also becomes your draw schedule, so the better it matches how your contractor bills, the smoother the draws.

3. Plans and permits

You can get a term sheet before your plans are approved. Approved plans and permits are needed before construction starts, so tell us early where you are in permitting and we will tell you what we need to close.

4. Your general contractor

A licensed general contractor runs the build. If you hold a valid GC license in the state where you are building, you can be your own GC.

5. The exit

Know your plan before you break ground: sell, or keep it as a rental. If you might keep it, check the rent against the payment on a DSCR loan now, so the refinance is planned from the start.

How it works with Requity

  1. Request your terms with the lot, the budget and your completed builds. Your term sheet shows up in minutes, with no hard credit pull.
  2. Pre-approval within 24 hours of the short disclosure form.
  3. Underwriting: appraisal, title, a budget and plan review, and a check of your completed projects.
  4. Close in as few as 10 business days once plans, budget and title are ready.
  5. Build on draws, then pay off from the sale or refinance into a DSCR loan.

What to send us for a quote

  • Lot address, purchase price and closing date (or what you paid, if you already own it)
  • Construction budget, by phase if you have it
  • Plans or a description: square feet, beds and baths, units
  • Comps for the completed value
  • Your completed ground-up projects in the last three years: addresses, and whether each was sold or refinanced
  • Your general contractor

You do not need every item to start. Send what you have, and call us early if you are about to tie up a lot.

Frequently asked questions

Can I get a spec home construction loan with no experience?

Not with Requity. You need at least one ground-up project completed in the last three years, sold or refinanced. If you have not built yet, a fix and flip loan is a common way to start, and work as a licensed general contractor on someone else’s build counts as half a project.

How much down payment do I need for a spec construction loan?

Your cash goes toward the lot, and how much depends on your experience and the numbers. In the example above it ranges from 10% to 20% of the total project cost, plus points and closing costs.

Do hard money lenders do construction loans?

Yes. What people call hard money construction loans are private construction loans: short-term, secured by the property and sized on the project. Requity makes them as a private lender, with written terms and a draw system.

How long is a spec construction loan?

Usually 12 to 24 months, depending on the size of the build. Plan the timeline with room for permitting, weather and inspections, and talk to us early if the build runs long.

Do you lend on spec homes in Florida?

Yes. We are based in Tampa and lend across the state. See construction loans in Florida and our Florida ground-up guide for wind, flood and permitting points that change a Florida build.

Get your terms

If you have a lot and a plan, request your terms and see them in minutes, or call us at 813.338.1000. Full program details are on our ground-up construction loans page.

Requity makes business-purpose loans on non-owner-occupied investment properties only, and does not offer owner-occupied construction loans. The example above is illustrative. Terms are set deal by deal, depend on the property, your credit and experience, and are subject to underwriting and change. A term sheet is not a commitment to lend.